Waiouru Water Treatment Plant

Sludge Pond Replacement Project

Mid 2025 we were commissioned to draft a design and build project to replace the aging small capacity ponds of approximately 144,000 litres to new ponds and concrete stand with a capacity of 880,000 litres within the same original footprint.

A custom designed concrete drain pad of 255m2 with incorporated pipe works and auto drain system back to the ponds.

In the design we were to allow for over 700 m2 of metal hardstand for pond clearing plant and and trucks to get access to all areas of the new ponds.

The construction phase was to be conducted while the plant remain in operation.

​

Waiouru Water Treatment Plant

20260825_145819

20260825_145819
20260825_145819

20260825_145819

02:10
20260825_145756.jpg

Project  Challenges

Every project has it challenges, this is what motivates us to use the kiwi ingenuity and our ability to look beyond the normal and seek out innovative ways to over come these.

 

After several meetings with NZDF managers and the NZDF Environmental team we looked into some of the various options to build these ponds out of that will give us the strength on the walls to sustain an hardstand for up to 13t machines and not have any properties leaching into the existing ground waters.

 

We put forward the use of Fiberglass Sheet Piles, these would be strong enough when locked together and not leach any chemicals or byproducts.

 

We designed four new ponds 16.5m x 5.5m that each can hold 220m3 to sludge to a total capacity of 880m3 and a 255m2 concrete drain pad that can hold two ponds of clear out for drying.

 

We incorporated large areas of hardstand with drainage installed to remove the ground water of the site.

 

Challenging and very rewarding

      

20260825_150152.jpg
20260825_145758.jpg
20260825_150148.jpg
20260825_150211.jpg
20260825_150201.jpg
20260610_084525.jpg
20260610_084841.jpg
20260610_084402.jpg
20260610_102210.jpg
20260825_150236.jpg
20260825_150233.jpg
813606049_1273881434833992_655390971609564639_n.jpg
810961639_4465356177128248_1095425948176072974_n.jpg
810930587_914068848166117_6588115644015313731_n.jpg

Meet The Taylor Long Construction Team on the Waiouru WTP Project

Photo_edited.jpg

Syd Taylor

Manager

Taylor.jpeg

Taylor Long

Manager

jacko_edited_edited.jpg

Chris Jackson aka Jacko

Tradesmen

ID photo_edited_edited.jpg

Jack Semple

Tradesmen

Photo_edited.jpg

Michael Hayes

Trade Supervisor

Photo_edited.jpg

Cole Hall

Trades and Site Supervisor

Picture3_edited.jpg

Mikaele Koroi

Advanced Team Assist

image15812778694572_edited.jpg

Robert Semple

Plant Operator

Photo.jpg

Kane Reid

Advanced Team Assist

image.png

Mike Later

Advanced Team Assist

Screenshot 2026-09-27 160032.png

Emma Maw

Waiouru Projects Manager

Our Valued Clients

PP LOGO 2021 Colour drop shadow_edited.jpg
Training and Competency Register.jpg
id_25026fv1j17q9so3aaqb_edited.jpg
OIP.jpg
OIP (1).jpg

© 2002 Taylor Long Construction LTD.

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
bottom of page