Re-Roof TWWTP Main Office

We were contracted to Re-roof the Taupo Waste Water Treatment Plant at Rickets Street.

The scope was to cover the existing rubber membrane on concrete slab with an light weight Coloursteel Long-run option, 590m2 of Five-Rib Profile 0.55 mm and costed.

DBCON Engineers were engaged to engineer the bolt fixings into the existing concrete slab roof and TrussTec to design the purpose built trusses with an run length of 18.4 metres.

Everything was delivered and lifted on to the roof space by Hawkes Crain Hire.

 